| The wastewater from the North and Woluwe basins will be treated by the Brussels-North plant, which will have the larger capacity of 1.100.000 inhabitant-equivalents. At the end of a tender process, the contract that included both designing and building the Brussels-North plant, and operating it for 20 years, was awarded to AQUIRIS, a group of companies lead by world leader in water services and treatment systems Veolia Water. This plant will be operational in summer 2006.
Freyssinet Belgium has proposed a solution for the three slabs of the main building, using posttensionnig. Freyssinet does the design and the installation of the cables. |